Typical Projects Performed

Work History 2015

Micro Piles & Helical Piles

Helical Piles

Micro Piles

Residence
Irvington, NY
14 Resistence Piers (2 7/8″ / 35 kip capacity) installed to depths of 25′
45 Micro Piles (4 1/2″ / 40 kip capacity) installed to depths of 35′

Residence
Chappaqua, NY
12 Resistance Piers (2 7/8″ / 35 kip capacity) installed to depths of 30′

Residence
Newark, NJ
8 Resistance Piers (3 1/2″ / 40 kip capacity) installed to depths of 15′
4 Micro Piles (4 1/2″ / 20 kip capacity) installed to depths of 15′

Residence
Pomfret Center, CT
12 Resistance Piers (2 7/8 / 35 ton capacity) installed to depths of 20′

Park- Concession and Restroom Building
Main Street – Stratford, CT
10 Resistence Piers ( 3 1/2″ / 45 kip capacity) installed to depths of 25 – 35′
Building on Non-performing wood piles which did not penetrate Fills & Organic Soils

Commercial Building
Grand Street – Croton on Hudson, NY
5 Resistance Piers (2 7/8″ / 35 kip capacity) installed to depths of 20′
Building Settlement due to fill soils and Organic soils

Residence
Ridgefield, CT
14 Resistance Piers (2 7/8″ / 35 kip capacity) installed to depths of 15′
Fill soils over Organic soils

Commercial
Old Greenwich, CT – Renovation of existing historic building
93 Helical Piles (1.5 /25 kip capacity) installed to depths of 20′
25 Helical Piles (1.5/ 25 kip capacity) installed to depths greater than 20′

Residence
Bedford, NY – Addition to existing home
28 Helical Piles with an ultimate load of 40 kips
43 Helical Piles with and ultimate load of 90 kips

Commercial
Madison, CT
24 Micro Piles installed to depths of 15 – 30′
Working load of 20 tons and ultimate load of 40 tons per pile

Residence
Fairfield, CT
26 Helical Piled installed to a depth up to 21′
2 Helical Piles installed to a depth up to 15′

Commercial
Poughkeepsie, NY
4 Tie Down Anchors with an overall length of 30′
150 kip ultimate load

Commercial Building
Pleansantville, NY
185 (3.5″ Round Shaft) Helical Piles installed for lengths of 45-75′

Pedestrian Bridge & Viewing Platform
Cheshire, CT
16(8″/12″) Stelcore grouted micro piles
10(5.5″) grouted micro piles

Institutional Building
Orangeburg, NY
14(7″) grouted micro piles

Residential Building
Tarrytown, NY – Limited access basement area (8′ headroom)
25(4″) 30 kip capacity grouted micro piles to 25′ depths

Power Plant Penstock
Gaylordsville, CT
30(50 kip capacity) grouted tie down anchors

New Elevator
Rye, NY -limited access basement area (8′ headroom)
3(4″-40 kip capacity) micro piles to 50′ depths

Shoring Soldier Piles
Brooklyn, NY – Limited access brownstone rear yard
35(5.5″) Soldier Piles

Residence
Madison, CT
38 (3 1/2″) round shaft helical piles

Residence
Madison, CT
44(7″)grouted micro piles

Beach Pavillion
Greenwich, CT
95(1 3/4″ sq Shaft) helical piles

Cell Tower
Poughkeepsie, NY
4(60 kip capacity) rock tie down anchors

Cell Tower
Pascoag, RI
4(80 kip capacity) soil tie down anchors

Pool & Patio
Bedford, NY
110(2 3/4 & 3’10’ round shaft) helical piles

Municipal Building
Mamaroneck, NY
5(5.5″/40 kip capacity0 grouted micro piles